News & Updates

Stay ahead with the latest infrastructure, investment and project news shaping the Thane real-estate market: market moves, developer updates, price trends and buyer guides.

MMRDA Plans 8th and 9th Ring Roads: How Thane Fits Into the 307-km MMR Network

MMRDA Plans 8th and 9th Ring Roads: How Thane Fits Into the 307-km MMR Network

MMRDA is planning two additional ring roads spanning approximately 307 km across the Mumbai Metropolitan Region. Here is how the Eighth and Ninth Ring Roads could connect Thane with Mumbai, Borivali, Navi Mumbai, Bhiwandi and the wider MMR road network.

MMRDA Plans 8th and 9th Ring Roads: How Thane Fits Into the 307-km MMR Network Read More »

Thane Bullet Train Station Metro and water transport connectivity

Beyond Roads: How Metro and Water Transport Could Connect Thane to Its Bullet Train Station

Thane Bullet Train Station at Mhatardi could eventually be connected to central Thane by Metro, while passenger-water infrastructure around Gaimukh, Kolshet, Kalher and Dombivli could add another layer to the station’s multimodal network. TREN examines what is planned, what is already under development and what remains to be finalised.

Beyond Roads: How Metro and Water Transport Could Connect Thane to Its Bullet Train Station Read More »

Thane Bullet Train Station connectivity via TDLR Kalyan Ring Road and Mhatardi

How Could Thane Reach the Bullet Train Station? TDLR, Kalyan Ring Road and the Plans Around Mhatardi

The Thane Bullet Train Station is coming up in the Mhatardi area, but how will people from Majiwada, Ghodbunder Road and core Thane reach it? TREN examines TDLR, Kalyan Ring Road, Bhopar, the Multi-Modal Corridor and other possible future connections using current government plans and infrastructure records.

How Could Thane Reach the Bullet Train Station? TDLR, Kalyan Ring Road and the Plans Around Mhatardi Read More »

Thane–Borivali Tunnel Latest Update 2026 Second TBM Arjuna Launched

Thane–Borivali Tunnel Latest Update 2026: Second TBM Arjuna Launched

The Thane–Borivali Twin Tunnel has reached another major construction milestone with the launch of TBM Arjuna on August 13, 2026. Here is the latest update on its route, construction progress, travel-time savings, completion timeline and relevance for Thane.

Thane–Borivali Tunnel Latest Update 2026: Second TBM Arjuna Launched Read More »

MahaRERA Grants 4-Month Extension to Eligible Real Estate Projects in Maharashtra

MahaRERA Grants 4-Month Extension to Eligible Real Estate Projects in Maharashtra

MahaRERA has granted a four-month extension to eligible registered real estate projects in Maharashtra following disruptions linked to the West Asia situation. The relief is subject to specific completion and registration dates and does not apply to every MahaRERA project.

MahaRERA Grants 4-Month Extension to Eligible Real Estate Projects in Maharashtra Read More »

Thane–Airoli Creek Bridge Tender Issued: New Six-Lane Link To Navi Mumbai Planned

Thane–Airoli Creek Bridge Tender Issued: New Six-Lane Link To Navi Mumbai Planned

The proposed Thane–Airoli creek bridge is back in focus after reports said that MMRDA has invited bids for a new six-lane link between Thane East and Airoli. The project could improve access towards Navi Mumbai’s employment belt and reduce pressure on existing creek crossings.

Thane–Airoli Creek Bridge Tender Issued: New Six-Lane Link To Navi Mumbai Planned Read More »

Majiwada To TDLR In 15–20 Minutes: Thane’s New Real Estate Belt Gets Easier To Reach

Majiwada To TDLR In 15–20 Minutes: Thane’s New Real Estate Market Gets Easier To Reach

The Majiwada to Thane-Dombivli Link Road drive is now taking around 15 to 20 minutes in regular traffic conditions. With improved bridge connectivity, road upgrades and future infrastructure such as Metro Line 5, the TDLR and Upper Thane belt is becoming one of the most closely watched real estate micro-markets near Thane.

Majiwada To TDLR In 15–20 Minutes: Thane’s New Real Estate Market Gets Easier To Reach Read More »

Gaimukh–Bhayandar Tunnel Cleared Ghodbunder Road Update1

Gaimukh–Bhayandar Tunnel Cleared: Ghodbunder Road Update

The Gaimukh–Fountain Hotel tunnel and Fountain Hotel–Bhayandar elevated road have been cleared under Maharashtra’s latest MMR infrastructure approvals. For Ghodbunder Road, Gaimukh and western MMR connectivity, this corridor is worth tracking closely.

Gaimukh–Bhayandar Tunnel Cleared: Ghodbunder Road Update Read More »

Thane Coastal Road Reaches 28% Completion, Ghodbunder Road Gets Closer To A Parallel Route

Thane Coastal Road Reaches 28% Completion, Ghodbunder Road Gets Closer To A Parallel Route

Thane’s Coastal Road has reached around 28% completion. The ₹2,727 crore six-lane corridor between Kharegaon and Gaimukh is expected to reduce pressure on Ghodbunder Road and improve long-term connectivity for Balkum, Kharegaon, Gaimukh and surrounding residential locations.

Thane Coastal Road Reaches 28% Completion, Ghodbunder Road Gets Closer To A Parallel Route Read More »

Thane To Samruddhi: Saket–Aamne Link Road Moves Into Focus

Thane To Samruddhi: Saket–Aamne Link Road Moves Into Focus

The proposed Saket–Aamne Link Road can become an important connector between Thane, Bhiwandi, Aamne and the Samruddhi Mahamarg access belt. For real estate buyers, the project is important because it brings Saket, Majiwada, Bhiwandi and the TDLR belt into a larger connectivity map.

Thane To Samruddhi: Saket–Aamne Link Road Moves Into Focus Read More »