News & Updates

Stay ahead with the latest infrastructure, investment and project news shaping the Thane real-estate market: market moves, developer updates, price trends and buyer guides.

Mumbai–Pune Expressway Missing Link Set For May 1 Opening, A Major Upgrade For Maharashtra’s Busiest Travel Corridor

Mumbai–Pune Expressway Missing Link Set For May 1 Opening, A Major Upgrade For Maharashtra’s Busiest Travel Corridor

The Mumbai–Pune Expressway Missing Link is scheduled to open on May 1, 2026, promising faster and safer travel through the ghat section while strengthening the wider Mumbai–Pune corridor.

Mumbai–Pune Expressway Missing Link Set For May 1 Opening, A Major Upgrade For Maharashtra’s Busiest Travel Corridor Read More »

Hafeez Contractor Speaks On Approvals, Design And Affordability At ET Maharashtra Summit

Hafeez Contractor Speaks On Approvals, Design And Affordability At ET Maharashtra Summit

At the ET Maharashtra Summit, Hafeez Contractor highlighted approval delays, design gaps, and the growing affordable housing challenge across Mumbai and MMR.

Hafeez Contractor Speaks On Approvals, Design And Affordability At ET Maharashtra Summit Read More »

Mumbai Water Metro: Thane Enters MMR’s Next Mobility Plan, Final Routes Still Await Clarity

Mumbai Water Metro: Thane Enters MMR’s Next Mobility Plan, Final Routes Still Await Clarity

Mumbai’s proposed Water Metro gains momentum with the Maharashtra Maritime Board’s RFP. Here’s what Thane, Kolshet and nearby corridors should track as route clarity develops.

Mumbai Water Metro: Thane Enters MMR’s Next Mobility Plan, Final Routes Still Await Clarity Read More »

Mumbai 3.0, Mumbai 4.0 And The Bullet-Train Corridor: Thane Finds A Larger Role

Mumbai 3.0, Mumbai 4.0 And The Bullet-Train Corridor: Thane Finds A Larger Role

Thane has re-entered the larger MMR growth discussion as Maharashtra links Mumbai 3.0, Mumbai 4.0 and bullet-train corridor development into a wider regional vision. Here is where Thane fits into that evolving map.

Mumbai 3.0, Mumbai 4.0 And The Bullet-Train Corridor: Thane Finds A Larger Role Read More »

Devendra Fadnavis Revives Mumbai Metro Line 11 To Gateway Of India, Proposed Bandra Extension Added

Devendra Fadnavis Revives Mumbai Metro Line 11 To Gateway Of India, Proposed Bandra Extension Added

Maharashtra Chief Minister Devendra Fadnavis has brought Mumbai Metro Line 11 back into focus through the Maharashtra Budget 2026-27, reviving the underground Wadala to Gateway of India corridor and outlining a proposed extension from Dharavi to Bandra suburban station and Bandra Terminus.

Devendra Fadnavis Revives Mumbai Metro Line 11 To Gateway Of India, Proposed Bandra Extension Added Read More »

Dosti Realty Enters Senior Living In Balkum, Thane With ₹150 Crore Dosti Primus Project

Dosti Realty Enters Senior Living In Balkum, Thane With ₹150 Crore Dosti Primus Project

Dosti Realty has entered the senior-living segment in Balkum, Thane with Dosti Primus, a ₹150 crore project inside Dosti West County. The launch signals how senior-focused housing is beginning to take shape within Thane’s large township market.

Dosti Realty Enters Senior Living In Balkum, Thane With ₹150 Crore Dosti Primus Project Read More »

Maharashtra May Raise Ready Reckoner Rates From April 2026; Official Decision Still Awaited

Maharashtra May Raise Ready Reckoner Rates From April 2026; Official Decision Still Awaited

Maharashtra may revise Ready Reckoner rates upward from April 2026, though the official decision is still awaited. For Thane and Mumbai, the reported move could affect stamp duty calculations, registration timing, and transaction structuring in select cases.

Maharashtra May Raise Ready Reckoner Rates From April 2026; Official Decision Still Awaited Read More »

Metro Line 5 Extensions To Badlapur, Titwala; Line 12 Link To Thane Floated In MMRDA Review

Metro Line 5 Extensions To Badlapur, Titwala; Line 12 Link To Thane Floated In MMRDA Review

Media reports say an MMRDA review discussed extending Metro Line 5 toward Badlapur and Titwala, linking Line 12 to Thane via Mumbra–Kalwa, and accelerating Line 14 planning for the Thane district belt.

Metro Line 5 Extensions To Badlapur, Titwala; Line 12 Link To Thane Floated In MMRDA Review Read More »

Maharashtra Plans 60 “Model” Property Registration Centres; Thane In The First Batch

Maharashtra Plans 60 “Model” Property Registration Centres; Thane In The First Batch

Maharashtra plans 60 “model” property registration centres with private facilitation and a service fee cap up to ₹6,000 per document. Thane is listed in Phase-1.

Maharashtra Plans 60 “Model” Property Registration Centres; Thane In The First Batch Read More »

Direct Dombivli–Thane Bus Via TDLR Starts 4 March: Route 82 To Connect Swaminarayan City, Lodha Upper Thane And Majiwada

Direct Dombivli–Thane Bus Via TDLR Starts 4 March: Route 82 To Connect Swaminarayan City, Lodha Upper Thane And Majiwada

KDMT’s Route 82 will start from 4 March 2026, linking Swaminarayan City (Dombivli) to Thane’s Majiwada Junction via the Thane–Dombivli Link Road (TDLR) and Lodha Upper Thane. The 14 km route has a 40-minute headway and fares from ₹5 to ₹20.

Direct Dombivli–Thane Bus Via TDLR Starts 4 March: Route 82 To Connect Swaminarayan City, Lodha Upper Thane And Majiwada Read More »