Mumbai Metropolitan Region

Thane–Airoli Creek Bridge Tender Issued: New Six-Lane Link To Navi Mumbai Planned

Thane–Airoli Creek Bridge Tender Issued: New Six-Lane Link To Navi Mumbai Planned

The proposed Thane–Airoli creek bridge is back in focus after reports said that MMRDA has invited bids for a new six-lane link between Thane East and Airoli. The project could improve access towards Navi Mumbai’s employment belt and reduce pressure on existing creek crossings.

Thane–Airoli Creek Bridge Tender Issued: New Six-Lane Link To Navi Mumbai Planned Read More »

Thane Ring Metro Comes Under PRAGATI Review As Work Begins On 29-km Corridor

Thane Ring Metro Comes Under PRAGATI Review As Work Begins On 29-km Corridor

The Thane Ring Metro has come under PRAGATI review as work begins on the 29-km corridor. The project could reshape internal connectivity across key Thane locations by 2029.

Thane Ring Metro Comes Under PRAGATI Review As Work Begins On 29-km Corridor Read More »

Maharashtra Cabinet Clears Land Policy For ‘Third Mumbai’ In Atal Setu Influence Area

Maharashtra Cabinet Clears Land Policy For ‘Third Mumbai’ In Atal Setu Influence Area

Maharashtra has cleared the ‘Third Mumbai’ land policy for the Atal Setu influence area, detailing 22.5% developed land return, cash/FSI/TDR compensation choices, pass-through industrial allotments, and FDI-linked eligibility norms.

Maharashtra Cabinet Clears Land Policy For ‘Third Mumbai’ In Atal Setu Influence Area Read More »

Raymond Realty Q3 FY26: Net Profit Rises to ₹66.79 Crore; Income at ₹765.97 Crore (Regulatory Filing)

Raymond Realty Q3 FY26: Net Profit Rises to ₹66.79 Crore; Income at ₹765.97 Crore (Regulatory Filing)

Raymond Realty reported Q3 FY26 net profit (PAT) of ₹66.79 crore and total income of ₹765.97 crore in its regulatory disclosure. The update also outlines its Thane pipeline (55 acres under development) and a JDA-led launch roadmap over the next 9–12 months.

Raymond Realty Q3 FY26: Net Profit Rises to ₹66.79 Crore; Income at ₹765.97 Crore (Regulatory Filing) Read More »

Outlet Mall Of India, Bhiwandi: Bhumi World’s Aim To Build India’s Biggest Outlet Mall (Target Opening: Mid-March 2026)

Outlet Mall Of India, Bhiwandi: Bhumi World’s Aim To Build India’s Biggest Outlet Mall (Target Opening: Mid-March 2026)

Bhumi World’s “Outlet Mall Of India” in Bhiwandi targets a mid-March 2026 opening with ~₹200 crore investment and a 365-day outlet-value format. With access via the Thane–Nashik Highway corridor (8-lane upgrade) and improved approach from Dombivli via TDLR, it is being positioned as a major drive-to retail destination for the outer MMR belt.

Outlet Mall Of India, Bhiwandi: Bhumi World’s Aim To Build India’s Biggest Outlet Mall (Target Opening: Mid-March 2026) Read More »

Thane Polls 2026: CM Devendra Fadnavis Promises Faster Metros, Traffic Relief and a Kolshet–Diva ‘Growth Hub’ for Thane–MMR

Thane Polls 2026: CM Devendra Fadnavis Promises Faster Metros, Traffic Relief and a Kolshet–Diva ‘Growth Hub’ for Thane–MMR

Ahead of the Thane Municipal Corporation elections, CM Devendra Fadnavis has promised faster metros, traffic relief, a Kolshet–Diva growth hub and stronger water security. This editorial breaks down what those assurances could mean for Thane’s infrastructure and long-term real estate value.

Thane Polls 2026: CM Devendra Fadnavis Promises Faster Metros, Traffic Relief and a Kolshet–Diva ‘Growth Hub’ for Thane–MMR Read More »

India’s Largest TBM Lowered in Thane: A Defining Moment for the Thane–Borivali Tunnel

India’s Largest TBM Lowered in Thane: A Defining Moment for the Thane–Borivali Tunnel

By Arosh John | Founder – John Real Estate (MahaRERA Reg. No. A51700001835), Editor-in-Chief – Thane Real Estate News (TREN)Thane–MMR | December 2025 A Major Construction Milestone for One of MMR’s Most Ambitious Road Projects The Thane–Borivali Twin Tunnel project achieved a landmark execution step with the lowering of India’s largest tunnel boring machine (TBM)

India’s Largest TBM Lowered in Thane: A Defining Moment for the Thane–Borivali Tunnel Read More »

Maharashtra Offers Major Incentives to Boost Rental Housing Development Across MMR

Maharashtra Offers Major Incentives to Boost Rental Housing Development Across MMR

By Arosh John | Founder – John Real Estate (MahaRERA Reg. No. A51700001835) | Editor-in-Chief – Thane Real Estate News (TREN) Thane–MMR | November 2025 Maharashtra had introduced a significant reform push to unlock large-scale rental housing across the Mumbai Metropolitan Region (MMR). The state’s draft rental housing policy, anchored by MHADA as the nodal

Maharashtra Offers Major Incentives to Boost Rental Housing Development Across MMR Read More »

MahaRERA Enforces 60-Day Deadline for Compensation Payments

MahaRERA Enforces 60-Day Deadline for Compensation Payments; Non-Payment to Trigger Asset Attachment and Recovery

By Arosh John | Founder – John Real Estate (MahaRERA Reg. No. A51700001835) | Editor-in-Chief – Thane Real Estate News (TREN)Thane–MMR | November 2025 A New Enforcement Framework Comes Into Effect MahaRERA has issued one of its strongest directives yet: developers must clear interest, penalty, or compensation dues within 60 days of an order.This framework—formalised

MahaRERA Enforces 60-Day Deadline for Compensation Payments; Non-Payment to Trigger Asset Attachment and Recovery Read More »

Mumbai Metro Line 4 Now 84% Complete: MMRDA Installs 56-Metre Steel Span at Ghatkopar

Mumbai Metro Line 4 Now 84% Complete: MMRDA Installs 56-Metre Steel Span at Ghatkopar

By Arosh John | Founder – John Real Estate (MahaRERA Reg. No. A51700001835) | Editor-in-Chief – Thane Real Estate News (TREN)Thane – MMR | November 2025 A 32 km corridor moves into its final phase According to the Mumbai Metropolitan Region Development Authority (MMRDA), construction of Metro Line 4 (Wadala to Kasarvadavali) has now advanced

Mumbai Metro Line 4 Now 84% Complete: MMRDA Installs 56-Metre Steel Span at Ghatkopar Read More »