Thane Connectivity

Ghodbunder Road to Be Widened Into a 14-Lane Corridor Under ₹5,200 Crore Plan

Ghodbunder Road to Be Widened Into a 14-Lane Corridor Under ₹5,200 Crore Plan

By Arosh John | Founder – John Real Estate (MahaRERA Reg. No. A51700001835) | Editor-in-Chief – Thane Real Estate News The Mumbai Metropolitan Region Development Authority (MMRDA) is embarking on a monumental infrastructure upgrade for Ghodbunder Road (SH-42), one of Thane’s most crucial arterial highways. According to reports, Ghodbunder Road will be converted into a […]

Ghodbunder Road to Be Widened Into a 14-Lane Corridor Under ₹5,200 Crore Plan Read More »

Metro Trial Runs Begin in Thane Today: A Step Closer to Seamless Connectivity

Metro Trial Runs Begin in Thane Today: A Step Closer to Seamless Connectivity

By Arosh John | Founder – John Real Estate (MahaRERA Reg. No. A51700001835) | Editor-in-Chief – Thane Real Estate News In a significant development today, Chief Minister Devendra Fadnavis visited Thane to review and flag off the first trial runs of the metro corridors. This marks a historic moment for the city’s infrastructure push, bringing

Metro Trial Runs Begin in Thane Today: A Step Closer to Seamless Connectivity Read More »

Kasarvadavali–Kharbao Bridge: Linking Thane to Bhiwandi’s Growth Corridor

Kasarvadavali–Kharbao Bridge: Linking Thane to Bhiwandi’s Growth Corridor

By Arosh John | Founder – John Real Estate | Editor-in-Chief – Thane Real Estate News Thane’s infrastructure story is entering a new phase. Beyond east–west links, the city is also building stronger north–south corridors to tie into logistics hubs like Bhiwandi. The Kasarvadavali–Kharbao Bridge is a crucial step in that direction, directly connecting Ghodbunder

Kasarvadavali–Kharbao Bridge: Linking Thane to Bhiwandi’s Growth Corridor Read More »

Navi Mumbai Airport: Impact on Thane Real Estate

How the Navi Mumbai International Airport Will Reshape Thane Real Estate

A Gamechanger Taking Shape The Navi Mumbai International Airport (NMIA) is entering its final phase of development and is expected to begin commercial operations by late 2025. Phase 1 alone is designed to handle close to 20 million passengers annually, with cargo facilities also integrated. This will not only redefine connectivity for Navi Mumbai but

How the Navi Mumbai International Airport Will Reshape Thane Real Estate Read More »