MMRDA

Unified Metro Authority in MMR: How This Policy Shift Enhances Thane’s Launch Appeal

Unified Metro Authority in MMR: How This Policy Shift Enhances Thane’s Launch Appeal

By Arosh John | Founder – John Real Estate (MahaRERA Reg. No. A51700001835) | Editor-in-Chief – Thane Real Estate News (TREN)Thane – MMR | November 2025 A Policy Reform That Could Reshape Urban Mobility in MMR The State Government has begun formal steps toward creating a unified metro operations structure for the Mumbai Metropolitan Region […]

Unified Metro Authority in MMR: How This Policy Shift Enhances Thane’s Launch Appeal Read More »

Ghodbunder Road 2.0: The Hidden Engine of Thane's Price Growth

Ghodbunder Road 2.0: The Hidden Engine of Thane’s Price Growth

By Arosh John | Founder – John Real Estate (MahaRERA Reg. No. A51700001835) | Editor-in-Chief – Thane Real Estate News (TREN)Thane – MMR | November 2025 Ghodbunder Road’s Second Act Ghodbunder Road has evolved from a peripheral stretch of Western Thane into one of the most infrastructure-powered corridors in the Mumbai Metropolitan Region (MMR). Connecting

Ghodbunder Road 2.0: The Hidden Engine of Thane’s Price Growth Read More »

Mumbai’s Underground Transformation Begins: MMRDA Starts DPR for Worli–BKC–Airport Tunnel; Wider 70 km Network Under Planning

Mumbai’s Underground Transformation Begins: MMRDA Starts DPR for Worli–BKC–Airport Tunnel; Wider 70 km Network Under Planning

By Arosh John | Founder – John Real Estate (MahaRERA Reg. No. A51700001835) | Editor-in-Chief – Thane Real Estate News (TREN)Thane – MMR | November 2025 The Mumbai Metropolitan Region Development Authority (MMRDA) has initiated formal groundwork for what could become one of India’s most ambitious underground mobility programmes. A public tender issued in October

Mumbai’s Underground Transformation Begins: MMRDA Starts DPR for Worli–BKC–Airport Tunnel; Wider 70 km Network Under Planning Read More »

Mumbai Metro Line 4 Now 84% Complete: MMRDA Installs 56-Metre Steel Span at Ghatkopar

Mumbai Metro Line 4 Now 84% Complete: MMRDA Installs 56-Metre Steel Span at Ghatkopar

By Arosh John | Founder – John Real Estate (MahaRERA Reg. No. A51700001835) | Editor-in-Chief – Thane Real Estate News (TREN)Thane – MMR | November 2025 A 32 km corridor moves into its final phase According to the Mumbai Metropolitan Region Development Authority (MMRDA), construction of Metro Line 4 (Wadala to Kasarvadavali) has now advanced

Mumbai Metro Line 4 Now 84% Complete: MMRDA Installs 56-Metre Steel Span at Ghatkopar Read More »

Mumbai Metro Map 2030: How Many Lines Will Be Ready — and How Travel Will Transform by the End of the Decade

Mumbai Metro Map 2030: How Many Lines Will Be Ready — and How Travel Will Transform by the End of the Decade

By Arosh John | Founder – John Real Estate (MahaRERA Reg. No. A51700001835) | Editor-in-Chief – Thane Real Estate News (TREN)Thane – MMR | November 2025 From Gridlock to Gridline In 2014, Mumbai’s metro map was a single blue streak, running from Versova to Ghatkopar.A decade later, yellow, red, and aqua corridors are beginning to

Mumbai Metro Map 2030: How Many Lines Will Be Ready — and How Travel Will Transform by the End of the Decade Read More »

Thane Internal Ring Metro Inches Closer to Groundbreaking — Tenders Live, Consultants Appointed

Thane Internal Ring Metro Inches Closer to Groundbreaking — Tenders Live, Consultants Appointed

By Arosh John | Founder – John Real Estate (MahaRERA Reg. No. A51700001835) Editor-in-Chief – Thane Real Estate News (TREN)Thane – MMR | October 2025 The city’s most-awaited loop project gathers pace Thane’s most ambitious infrastructure project — the Internal Ring Metro — is quietly shifting gears.The 29-kilometre circular corridor, approved by the Union Cabinet

Thane Internal Ring Metro Inches Closer to Groundbreaking — Tenders Live, Consultants Appointed Read More »

Prepare Now: Tender Floated for Ghodbunder Road Repairs Starting November 10

Prepare Now: Tender Floated for Ghodbunder Road Repairs Starting November 10

By Arosh John | Founder – John Real Estate (MahaRERA Reg. No. A51700001835) | Editor-in-Chief – Thane Real Estate News (TREN)Thane – MMR | October 2025 A Focused Repair, Not a Mega-Widening Promise The Thane Municipal Corporation (TMC) has floated a tender for critical resurfacing and repair work on a roughly 700-metre stretch of Ghodbunder

Prepare Now: Tender Floated for Ghodbunder Road Repairs Starting November 10 Read More »

MMRDA to Replicate CIDCO & MIDC Land Acquisition Model for ‘Third Mumbai’

MMRDA to Replicate CIDCO & MIDC Land Acquisition Model for ‘Third Mumbai’

By Arosh John | Founder – John Real Estate (MahaRERA Reg. No. A51700001835) | Editor-in-Chief – Thane Real Estate News (TREN)Thane – MMR | October 2025 Maharashtra’s Next Big City Takes Shape The Mumbai Metropolitan Region Development Authority (MMRDA) is moving ahead with the Third Mumbai project, officially known as the Karnala–Sai–Chirner (KSC) New Town.Often

MMRDA to Replicate CIDCO & MIDC Land Acquisition Model for ‘Third Mumbai’ Read More »

Mumbai Metropolitan Region Poised to Become a Trillion-Dollar Urban Economy by 2047 — Thane Set to Lead the Next-Phase Growth

Mumbai Metropolitan Region Poised to Become a Trillion-Dollar Urban Economy by 2047 — Thane Set to Lead the Next-Phase Growth

By Arosh John | Founder – John Real Estate (MahaRERA Reg. No. A51700001835) | Editor-in-Chief – Thane Real Estate News (TREN)Thane – MMR | October 2025 MMR’s Trillion-Dollar Vision The Mumbai Metropolitan Region (MMR) is projected to evolve into one of the world’s largest urban economies by 2047, targeting a GDP of $1.2 – $1.5

Mumbai Metropolitan Region Poised to Become a Trillion-Dollar Urban Economy by 2047 — Thane Set to Lead the Next-Phase Growth Read More »

Official route map of Virar–Alibaug Multimodal Corridor connecting Virar, Bhiwandi, Kalyan, Pen and Alibaug under MSRDC.

Virar–Alibaug Multimodal Corridor Explained — Route, Cost, Status and Real Estate Impact

Thane–MMR | October 2025 — The Virar–Alibaug Multimodal Corridor (VAMC) is not just another infrastructure initiative but a strategic lifeline planned to reshape mobility and development patterns across Maharashtra. It aims to connect the Virar–Navghar region in the north to Pen and Alibaug in the south through a fully access-controlled corridor. Once developed, it is

Virar–Alibaug Multimodal Corridor Explained — Route, Cost, Status and Real Estate Impact Read More »