Metro Line 4A

Metro Line 4A Gaimukh–Cadbury: Civil Works Complete; Safety Clearances And Trial Runs Next

Metro Line 4A Gaimukh–Cadbury: Civil Works Complete; Safety Clearances And Trial Runs Next

Civil works are reported complete on the Gaimukh–Cadbury stretch linked to Mumbai Metro Line 4A. The corridor now moves into system checks, safety inspection, and phased trial runs.

Metro Line 4A Gaimukh–Cadbury: Civil Works Complete; Safety Clearances And Trial Runs Next Read More »

Cadbury–Gaimukh by March 2026: What Early Line-4 Operations Mean for Thane Station Micro-Markets

Cadbury–Gaimukh by March 2026: What Early Line-4 Operations Mean for Thane Station Micro-Markets

Thane’s metro narrative moves toward operations in 2026. Here’s a station-by-station impact map for the Cadbury Junction–Gaimukh belt and what it changes for micro-markets.

Cadbury–Gaimukh by March 2026: What Early Line-4 Operations Mean for Thane Station Micro-Markets Read More »

₹1,415 Cr Ring-Metro Viaduct Contract: Why Thane Developers Should Be Watching the Transit Impact

₹1,415 Cr Ring-Metro Viaduct Contract: Why Thane Developers Should Be Watching the Transit Impact

By Arosh John | Founder – John Real Estate (MahaRERA Reg. No. A51700001835) | Editor-in-Chief – Thane Real Estate News (TREN)Thane – MMR | November 2025 A Major Execution Step for Thane’s Internal Ring Metro MahaMetro has announced the award of a ₹1,415-crore EPC contract to the joint venture of H.G. Infra Engineering Ltd and

₹1,415 Cr Ring-Metro Viaduct Contract: Why Thane Developers Should Be Watching the Transit Impact Read More »

Mumbai Metro Line 4 Now 84% Complete: MMRDA Installs 56-Metre Steel Span at Ghatkopar

Mumbai Metro Line 4 Now 84% Complete: MMRDA Installs 56-Metre Steel Span at Ghatkopar

By Arosh John | Founder – John Real Estate (MahaRERA Reg. No. A51700001835) | Editor-in-Chief – Thane Real Estate News (TREN)Thane – MMR | November 2025 A 32 km corridor moves into its final phase According to the Mumbai Metropolitan Region Development Authority (MMRDA), construction of Metro Line 4 (Wadala to Kasarvadavali) has now advanced

Mumbai Metro Line 4 Now 84% Complete: MMRDA Installs 56-Metre Steel Span at Ghatkopar Read More »

MCZMA Clears Connectivity for Metro Line 4 & 4A to Mogharpada Car Shed — Major Boost for Thane–Mumbai Corridor

MCZMA Clears Connectivity for Metro Line 4 & 4A to Mogharpada Car Shed — Major Boost for Thane–Mumbai Corridor

By Arosh John | Founder – John Real Estate (MahaRERA Reg. No. A51700001835) | Editor-in-Chief – Thane Real Estate News (TREN)Thane – MMR | October 2025 The Maharashtra Coastal Zone Management Authority (MCZMA) has formally approved the elevated connectivity linking Metro Line 4 (Wadala – Kasarvadavli) and its extension, Metro Line 4A (Kasarvadavli – Gaimukh),

MCZMA Clears Connectivity for Metro Line 4 & 4A to Mogharpada Car Shed — Major Boost for Thane–Mumbai Corridor Read More »