Metro Line 4

Ghodbunder Road 2.0: The Hidden Engine of Thane's Price Growth

Ghodbunder Road 2.0: The Hidden Engine of Thane’s Price Growth

By Arosh John | Founder – John Real Estate (MahaRERA Reg. No. A51700001835) | Editor-in-Chief – Thane Real Estate News (TREN)Thane – MMR | November 2025 Ghodbunder Road’s Second Act Ghodbunder Road has evolved from a peripheral stretch of Western Thane into one of the most infrastructure-powered corridors in the Mumbai Metropolitan Region (MMR). Connecting […]

Ghodbunder Road 2.0: The Hidden Engine of Thane’s Price Growth Read More »

Mumbai Metro Line 4 Now 84% Complete: MMRDA Installs 56-Metre Steel Span at Ghatkopar

Mumbai Metro Line 4 Now 84% Complete: MMRDA Installs 56-Metre Steel Span at Ghatkopar

By Arosh John | Founder – John Real Estate (MahaRERA Reg. No. A51700001835) | Editor-in-Chief – Thane Real Estate News (TREN)Thane – MMR | November 2025 A 32 km corridor moves into its final phase According to the Mumbai Metropolitan Region Development Authority (MMRDA), construction of Metro Line 4 (Wadala to Kasarvadavali) has now advanced

Mumbai Metro Line 4 Now 84% Complete: MMRDA Installs 56-Metre Steel Span at Ghatkopar Read More »

Mumbai Metro Map 2030: How Many Lines Will Be Ready — and How Travel Will Transform by the End of the Decade

Mumbai Metro Map 2030: How Many Lines Will Be Ready — and How Travel Will Transform by the End of the Decade

By Arosh John | Founder – John Real Estate (MahaRERA Reg. No. A51700001835) | Editor-in-Chief – Thane Real Estate News (TREN)Thane – MMR | November 2025 From Gridlock to Gridline In 2014, Mumbai’s metro map was a single blue streak, running from Versova to Ghatkopar.A decade later, yellow, red, and aqua corridors are beginning to

Mumbai Metro Map 2030: How Many Lines Will Be Ready — and How Travel Will Transform by the End of the Decade Read More »

Thane Internal Ring Metro Inches Closer to Groundbreaking — Tenders Live, Consultants Appointed

Thane Internal Ring Metro Inches Closer to Groundbreaking — Tenders Live, Consultants Appointed

By Arosh John | Founder – John Real Estate (MahaRERA Reg. No. A51700001835) Editor-in-Chief – Thane Real Estate News (TREN)Thane – MMR | October 2025 The city’s most-awaited loop project gathers pace Thane’s most ambitious infrastructure project — the Internal Ring Metro — is quietly shifting gears.The 29-kilometre circular corridor, approved by the Union Cabinet

Thane Internal Ring Metro Inches Closer to Groundbreaking — Tenders Live, Consultants Appointed Read More »

MCZMA Clears Connectivity for Metro Line 4 & 4A to Mogharpada Car Shed — Major Boost for Thane–Mumbai Corridor

MCZMA Clears Connectivity for Metro Line 4 & 4A to Mogharpada Car Shed — Major Boost for Thane–Mumbai Corridor

By Arosh John | Founder – John Real Estate (MahaRERA Reg. No. A51700001835) | Editor-in-Chief – Thane Real Estate News (TREN)Thane – MMR | October 2025 The Maharashtra Coastal Zone Management Authority (MCZMA) has formally approved the elevated connectivity linking Metro Line 4 (Wadala – Kasarvadavli) and its extension, Metro Line 4A (Kasarvadavli – Gaimukh),

MCZMA Clears Connectivity for Metro Line 4 & 4A to Mogharpada Car Shed — Major Boost for Thane–Mumbai Corridor Read More »

Thane: From Satellite Suburb to Independent Real Estate Hub

Thane: From Satellite Suburb to Independent Real Estate Hub

By Arosh John – Founder, John Real Estate (MahaRERA Reg. No. A51700001835) | Recognised as one of Thane’s leading real estate consultants & Editor-in-Chief, Thane Real Estate News Introduction Thane, once regarded as Mumbai’s overflow suburb, has decisively stepped into its own identity. With nearly 60% property price growth in the past five years, landmark

Thane: From Satellite Suburb to Independent Real Estate Hub Read More »

Ghodbunder Road to Be Widened Into a 14-Lane Corridor Under ₹5,200 Crore Plan

Ghodbunder Road to Be Widened Into a 14-Lane Corridor Under ₹5,200 Crore Plan

By Arosh John | Founder – John Real Estate (MahaRERA Reg. No. A51700001835) | Editor-in-Chief – Thane Real Estate News The Mumbai Metropolitan Region Development Authority (MMRDA) is embarking on a monumental infrastructure upgrade for Ghodbunder Road (SH-42), one of Thane’s most crucial arterial highways. According to reports, Ghodbunder Road will be converted into a

Ghodbunder Road to Be Widened Into a 14-Lane Corridor Under ₹5,200 Crore Plan Read More »

Green Line Metro Coaches Placed on Tracks in Thane – Trial Run Preparations Begin

Green Line Metro Coaches Placed on Tracks in Thane – Trial Run Preparations Begin

Thane, August 25, 2025 – A major milestone has been achieved for Thane’s Green Line Metro (Line 4/4A). In a late-night operation at Anand Nagar, the first two metro coaches were successfully lifted and placed on the elevated viaduct, marking the beginning of trial run preparations. According to MMRDA officials, the trial runs are scheduled

Green Line Metro Coaches Placed on Tracks in Thane – Trial Run Preparations Begin Read More »

Ghodbunder Road – The Growth Corridor of Thane Real Estate

Ghodbunder Road – The Growth Corridor of Thane Real Estate

Ghodbunder Road has evolved from a connector highway into one of Thane’s most dynamic real estate destinations. Strategically linking the Eastern and Western suburbs of Mumbai, this corridor has become synonymous with growth, infrastructure upgrades, and lifestyle living. For both end-users and investors, Ghodbunder Road continues to deliver unmatched potential. Strategic Connectivity Ghodbunder Road connects

Ghodbunder Road – The Growth Corridor of Thane Real Estate Read More »