Dombivli

Metro Line 5 Extensions To Badlapur, Titwala; Line 12 Link To Thane Floated In MMRDA Review

Metro Line 5 Extensions To Badlapur, Titwala; Line 12 Link To Thane Floated In MMRDA Review

Media reports say an MMRDA review discussed extending Metro Line 5 toward Badlapur and Titwala, linking Line 12 to Thane via Mumbra–Kalwa, and accelerating Line 14 planning for the Thane district belt.

Metro Line 5 Extensions To Badlapur, Titwala; Line 12 Link To Thane Floated In MMRDA Review Read More »

Direct Dombivli–Thane Bus Via TDLR Starts 4 March: Route 82 To Connect Swaminarayan City, Lodha Upper Thane And Majiwada

Direct Dombivli–Thane Bus Via TDLR Starts 4 March: Route 82 To Connect Swaminarayan City, Lodha Upper Thane And Majiwada

KDMT’s Route 82 will start from 4 March 2026, linking Swaminarayan City (Dombivli) to Thane’s Majiwada Junction via the Thane–Dombivli Link Road (TDLR) and Lodha Upper Thane. The 14 km route has a 40-minute headway and fares from ₹5 to ₹20.

Direct Dombivli–Thane Bus Via TDLR Starts 4 March: Route 82 To Connect Swaminarayan City, Lodha Upper Thane And Majiwada Read More »

TDLR Corridor: From A Link Road To A Full Ecosystem (Thane–Dombivli Growth Belt, 2026)

TDLR Corridor: From A Link Road To A Full Ecosystem (Thane–Dombivli Growth Belt, 2026)

TDLR (Thane–Dombivli Link Road) is moving beyond connectivity into a full ecosystem—ready-to-move homes, luxury villas, operational schools, retail, and offices—now active across the corridor.

TDLR Corridor: From A Link Road To A Full Ecosystem (Thane–Dombivli Growth Belt, 2026) Read More »

Metro Line 12A: 18.4 km Elevated Kalyan–Shilphata Extension With 12 Stations

Metro Line 12A: 18.4 km Elevated Kalyan–Shilphata Extension With 12 Stations

MMRDA has announced Metro Line 12A—an 18.4 km elevated extension along Kalyan–Shilphata Road with 12 stations and ₹8,414.53 crore approval—planned to link Line 12, a shared segment with Line 14, and Nilje depot operations.

Metro Line 12A: 18.4 km Elevated Kalyan–Shilphata Extension With 12 Stations Read More »

Outlet Mall Of India, Bhiwandi: Bhumi World’s Aim To Build India’s Biggest Outlet Mall (Target Opening: Mid-March 2026)

Outlet Mall Of India, Bhiwandi: Bhumi World’s Aim To Build India’s Biggest Outlet Mall (Target Opening: Mid-March 2026)

Bhumi World’s “Outlet Mall Of India” in Bhiwandi targets a mid-March 2026 opening with ~₹200 crore investment and a 365-day outlet-value format. With access via the Thane–Nashik Highway corridor (8-lane upgrade) and improved approach from Dombivli via TDLR, it is being positioned as a major drive-to retail destination for the outer MMR belt.

Outlet Mall Of India, Bhiwandi: Bhumi World’s Aim To Build India’s Biggest Outlet Mall (Target Opening: Mid-March 2026) Read More »

Bhiwandi 2043: The Real Strategy That Can Make It a Major Regional Centre (BNCMC + MMRDA)

Bhiwandi 2043: The Real Strategy That Can Make It a Major Regional Centre (BNCMC + MMRDA)

By Arosh John, Founder, John Real Estate (MahaRERA Reg. No. A51700001835) | Editor-in-Chief, Thane Real Estate News (TREN)Thane–MMR | December 2025 Bhiwandi is no longer just a “powerloom city” or a “warehouse city.” It is evolving into something bigger: a regional engine for jobs, logistics, and housing within the Mumbai Metropolitan Region (MMR). The key

Bhiwandi 2043: The Real Strategy That Can Make It a Major Regional Centre (BNCMC + MMRDA) Read More »