Transit-Oriented Development

Unified Metro Authority in MMR: How This Policy Shift Enhances Thane’s Launch Appeal

Unified Metro Authority in MMR: How This Policy Shift Enhances Thane’s Launch Appeal

By Arosh John | Founder – John Real Estate (MahaRERA Reg. No. A51700001835) | Editor-in-Chief – Thane Real Estate News (TREN)Thane – MMR | November 2025 A Policy Reform That Could Reshape Urban Mobility in MMR The State Government has begun formal steps toward creating a unified metro operations structure for the Mumbai Metropolitan Region […]

Unified Metro Authority in MMR: How This Policy Shift Enhances Thane’s Launch Appeal Read More »

Infrastructure-Driven Micro-Markets: Why Thane Is India’s Next Big Real-Estate Story

Infrastructure-Driven Micro-Markets: Why Thane Is India’s Next Big Real-Estate Story

By Arosh John | Founder – John Real Estate (MahaRERA Reg. No. A51700001835) | Editor-in-Chief – Thane Real Estate News (TREN)Thane – MMR | October 2025 India’s Real-Estate Growth Has a New Driver A joint research study by the Investment Information and Credit Rating Agency of India (ICRA) and Housing.com finds that India’s most resilient

Infrastructure-Driven Micro-Markets: Why Thane Is India’s Next Big Real-Estate Story Read More »

Mumbai–Ahmedabad Bullet Train: All You Need to Know About India’s First High-Speed Rail Project

Mumbai–Ahmedabad Bullet Train: All You Need to Know About India’s First High-Speed Rail Project

By Arosh John | Thane Real Estate Expert | Founder – John Real Estate (MahaRERA Reg. No. A51700001835) | Editor-in-Chief – Thane Real Estate News Introduction India’s first high-speed rail corridor—the Mumbai–Ahmedabad Bullet Train (MAHSR)—is under construction. Stretching 508.17 km and designed for speeds of 320 km/h, the project aims to reduce Mumbai–Ahmedabad travel time

Mumbai–Ahmedabad Bullet Train: All You Need to Know About India’s First High-Speed Rail Project Read More »