Real Estate Impact

Maharashtra Cabinet Clears Metro Line 8 (“Gold Line”) to Link Mumbai Airport and Navi Mumbai International Airport

Maharashtra Cabinet Clears Metro Line 8 (“Gold Line”) to Link Mumbai Airport and Navi Mumbai International Airport

Maharashtra has cleared Metro Line 8 (Gold Line), a planned ~35-km corridor with 20 stations and an estimated cost of ₹22,862 crore to connect CSMIA T2 and NMIA T2.

Maharashtra Cabinet Clears Metro Line 8 (“Gold Line”) to Link Mumbai Airport and Navi Mumbai International Airport Read More »

Ghatkopar–Thane Elevated Freeway

Ghatkopar–Thane Elevated Freeway: Thane’s Direct Link to the Eastern Freeway and Beyond

Project Snapshot Work has finally begun on one of the most important road projects for Mumbai and Thane commuters. The Ghatkopar–Thane elevated freeway is being built in two phases: Together, these two phases will create a signal-free spine from Ghatkopar to Saket, right up to the entry of the Mumbai–Nashik Expressway. Why This Matters For

Ghatkopar–Thane Elevated Freeway: Thane’s Direct Link to the Eastern Freeway and Beyond Read More »