MMRCL

Mumbai Metro Map 2030: How Many Lines Will Be Ready — and How Travel Will Transform by the End of the Decade

Mumbai Metro Map 2030: How Many Lines Will Be Ready — and How Travel Will Transform by the End of the Decade

By Arosh John | Founder – John Real Estate (MahaRERA Reg. No. A51700001835) | Editor-in-Chief – Thane Real Estate News (TREN)Thane – MMR | November 2025 From Gridlock to Gridline In 2014, Mumbai’s metro map was a single blue streak, running from Versova to Ghatkopar.A decade later, yellow, red, and aqua corridors are beginning to […]

Mumbai Metro Map 2030: How Many Lines Will Be Ready — and How Travel Will Transform by the End of the Decade Read More »

Mumbai Metro Line 11: 17.4 km Underground Corridor from Wadala to Gateway of India

Mumbai Metro Line 11: 17.4 km Underground Corridor from Wadala to Gateway of India

By Arosh John | Founder – John Real Estate (MahaRERA Reg. No. A51700001835) | Editor-in-Chief – Thane Real Estate News (TREN)Thane – MMR | October 2025 The Southward Extension That Completes Mumbai’s Metro Spine Mumbai’s next great metro chapter has begun. Metro Line 11, a 17.4-kilometre fully underground corridor, will connect Wadala to CST, Colaba,

Mumbai Metro Line 11: 17.4 km Underground Corridor from Wadala to Gateway of India Read More »