Gaimukh

Thane Coastal Road-1 Update: MMRDA Reports Over 50% Elevated Foundation Work Completed In 8 Months

Thane Coastal Road-1 Update: MMRDA Reports Over 50% Elevated Foundation Work Completed In 8 Months

MMRDA says Thane Coastal Road-1 has completed over 50% elevated foundation work within eight months. Pier-cap work and I-girder erection are now underway.

Thane Coastal Road-1 Update: MMRDA Reports Over 50% Elevated Foundation Work Completed In 8 Months Read More »

Thane West 2026 Outlook: Metro 4A, Coastal Road, Creek Bridges, And EV Infra Converging On The Ghodbunder–Gaimukh Belt

Thane West 2026 Outlook: Metro 4A, Coastal Road, Creek Bridges, And EV Infra Converging On The Ghodbunder–Gaimukh Belt

Thane West’s 2026 outlook is a corridor story—Metro 4A, Ghodbunder upgrades, the Balkum–Gaimukh coastal road, creek bridges to NH-48 and a citywide EV charging rollout converging on the Ghodbunder–Gaimukh belt.

Thane West 2026 Outlook: Metro 4A, Coastal Road, Creek Bridges, And EV Infra Converging On The Ghodbunder–Gaimukh Belt Read More »

Metro Line 4A Gaimukh–Cadbury: Civil Works Complete; Safety Clearances And Trial Runs Next

Metro Line 4A Gaimukh–Cadbury: Civil Works Complete; Safety Clearances And Trial Runs Next

Civil works are reported complete on the Gaimukh–Cadbury stretch linked to Mumbai Metro Line 4A. The corridor now moves into system checks, safety inspection, and phased trial runs.

Metro Line 4A Gaimukh–Cadbury: Civil Works Complete; Safety Clearances And Trial Runs Next Read More »

Metro Line 4 Green Line stations on Ghodbunder Road and Line 4A catchments in Thane

Metro Line 4 (Green Line) Catchments Along Ghodbunder: The Walkability Premium (Station-by-Station Guide + Line 4A)

Ghodbunder’s next “metro premium” won’t be about map distance. It will be about walkability—safe crossings, footpaths, lighting, and the last 200 metres. Station-by-station guide for Metro Line 4 (Green Line) plus Line 4A.

Metro Line 4 (Green Line) Catchments Along Ghodbunder: The Walkability Premium (Station-by-Station Guide + Line 4A) Read More »

Cadbury–Gaimukh by March 2026: What Early Line-4 Operations Mean for Thane Station Micro-Markets

Cadbury–Gaimukh by March 2026: What Early Line-4 Operations Mean for Thane Station Micro-Markets

Thane’s metro narrative moves toward operations in 2026. Here’s a station-by-station impact map for the Cadbury Junction–Gaimukh belt and what it changes for micro-markets.

Cadbury–Gaimukh by March 2026: What Early Line-4 Operations Mean for Thane Station Micro-Markets Read More »

Thane Real Estate 2020–2025: 5 Years After COVID — What Broke, What Changed, Where We’re Heading

Thane Real Estate 2020–2025: 5 Years After COVID — What Broke, What Changed, Where We’re Heading

A five-year recap of Thane real estate from 2020 to 2025—what COVID changed, how buyers evolved, and why infrastructure and execution now drive the next cycle.

Thane Real Estate 2020–2025: 5 Years After COVID — What Broke, What Changed, Where We’re Heading Read More »

Why Gaimukh–Kasarvadavali Is Quietly Becoming Thane’s Next Big Junction : Metro 10 & Ring Metro

Why Gaimukh–Kasarvadavali Is Quietly Becoming Thane’s Next Big Junction : Metro 10 & Ring Metro

How the Green Line, Metro 10 and Thane’s Internal Ring Metro converge to revalue a once-‘terminal’ suburb By Arosh John – Founder, John Real Estate (MahaRERA Reg. No. A51700001835) & Editor-in-Chief, Thane Real Estate News (TREN)Thane–MMR | December 2025 For years, Gaimukh and Kasarvadavali sat at the “last-stop” end of Ghodbunder Road – a mix

Why Gaimukh–Kasarvadavali Is Quietly Becoming Thane’s Next Big Junction : Metro 10 & Ring Metro Read More »

Gaimukh–Paye Gaon Creek Bridge Is Under Construction: A New Artery Between Thane and Bhiwandi

Gaimukh–Paye Gaon Creek Bridge Is Under Construction: A New Artery Between Thane and Bhiwandi

By Arosh John | Founder – John Real Estate (MahaRERA Reg. No. A51700001835) | Editor-in-Chief – Thane Real Estate News (TREN)Thane – MMR | October 2025 A new cross-creek link taking shape on Thane’s western edge Thane’s western corridor is witnessing another significant infrastructure milestone.The Gaimukh–Paye Gaon Creek Bridge, a 6.509 km connector between Ghodbunder

Gaimukh–Paye Gaon Creek Bridge Is Under Construction: A New Artery Between Thane and Bhiwandi Read More »

Prepare Now: Tender Floated for Ghodbunder Road Repairs Starting November 10

Prepare Now: Tender Floated for Ghodbunder Road Repairs Starting November 10

By Arosh John | Founder – John Real Estate (MahaRERA Reg. No. A51700001835) | Editor-in-Chief – Thane Real Estate News (TREN)Thane – MMR | October 2025 A Focused Repair, Not a Mega-Widening Promise The Thane Municipal Corporation (TMC) has floated a tender for critical resurfacing and repair work on a roughly 700-metre stretch of Ghodbunder

Prepare Now: Tender Floated for Ghodbunder Road Repairs Starting November 10 Read More »