By Arosh John | Founder – John Real Estate | Editor-in-Chief – Thane Real Estate News
Thane’s infrastructure story is entering a new phase. Beyond east–west links, the city is also building stronger north–south corridors to tie into logistics hubs like Bhiwandi. The Kasarvadavali–Kharbao Bridge is a crucial step in that direction, directly connecting Ghodbunder Road with MSH-4 at Kharbao.
🔹 What’s Coming
- Length: ~3.9 km
- Width: 40 m Right of Way
- Lanes: 4+4 (eight-lane configuration)
- Alignment: From Kasarvadavali (Ghodbunder Rd) to Kharbao (Bhiwandi), crossing major freight and transport corridors
- Integration: Designed to link with the Thane Coastal Road (Balkum–Gaimukh) and the Virar–Alibaug Multi-Modal Corridor (VAMMC)
🔹 Why It Matters for Thane
- Traffic Relief: Provides a direct bypass to Bhiwandi, reducing congestion on NH-3 and Old Agra Road.
- Industrial Growth: Strengthens Bhiwandi’s warehousing ecosystem, already a powerhouse for e-commerce and logistics.
- Commuter Ease: Cuts travel time between Thane’s residential hubs and industrial job centres.
🔹 Current Status
- Clearances: Environmental approval from MCZMA in December 2024, confirmed in media reports by January 2025.
- Funding: One of nine MMRDA projects cleared in September 2024, with an indicative cost of ~₹1,525 crore.
- Contractor: Afcons Infrastructure has been cited as the lowest bidder/likely executing agency.
🔹 Real Estate Impact
- Residential Pockets: Kasarvadavali, Waghbil, and Kavesar stand to benefit as connectivity improves, enhancing liveability and market demand.
- Sales Momentum: Reduced commute times often lead to faster absorption and long-term price appreciation.
- Commercial & Warehousing: Reinforces Bhiwandi’s dominance as a warehousing hub; demand for workforce housing expected near Kharbao and Anjur Phata.
- Regional Integration: Once tied into VAMMC and Thane Coastal Road, this bridge will anchor Ghodbunder Road as part of a wider transport spine.
🔹 Key Takeaways
- Strengthens Thane–Bhiwandi logistics link and boosts Ghodbunder Road micro-markets.
- Project specs: ~3.9 km, 40 m ROW, 4+4 lanes.
- Status: MCZMA clearance (Dec 2024); part of nine MMRDA projects.
- Cost: ~₹1,525 crore; Afcons cited as lowest bidder.
About the Author
Arosh John is a MahaRERA-registered Real Estate Consultant, Founder of John Real Estate, and Editor-in-Chief of Thane Real Estate News. With over a decade of experience, he specialises in luxury villas, resale transactions, and NRI investments.
Disclaimer
This article is based on official MMRDA updates, MCZMA records, and media reports as of September 2025. Timelines and specifications may change. References to agencies and contractors are for informational purposes only.
Sources & Notes
- MCZMA minutes (Dec 2024): 40 m ROW, 4+4 lanes, ~3.9 km Kasarvadavali–Kharbao link.
- Media reports (Jan 2025): Clearance confirmed; bridge listed as part of nine MMRDA projects.
- Project cost ~₹1,525 crore; Afcons cited as lowest bidder in industry reports.